Skip to main content
ssr机场推荐2022
The Deferred Maintenance Project

Investing in the care of our campus

佛跳墙加器器2025

What is deferred maintenance? Deferred maintenance is an industry term that refers to the practice of postponing building and system upkeep due to lack of funds. For example, when we construct new buildings or facilities, we may get funding from the state or from a donor to build it, but then it is up to the to university to maintain it. The state does provide funds annually for this purpose, but, with a campus as large and unique as UC Davis, that support does not usually cover the wide range of work needed.

Our campus is unique. It spans 5,300 acres, is home to almost 1,000 buildings and 130 miles of infrastructure that serve more than 36,000 students – nearly 25,000 from California. Many of our buildings and much our original infrastructure are over 50 years old. While we have done an incredible job prolonging the life of many building systems and facilities, UC Davis faces the most significant deferred maintenance challenge in the UC system with a $1 billion backlog. 

This site was created to share how UC Davis is currently tackling its most critical deferred maintenance needs. While the projects found here address less than 10% of our backlog, our teams from Design and Construction Management, Facilities Management and Campus Planning are working strategically to ensure that we capitalize on opportunities to deliver multiple benefits for less total budget. 

Learn more. Download the UC Davis deferred maintenance project plan.

佛跳墙加器器2025

Decorative image.

佛跳墙加器器2025

Decorative image.

佛跳墙加器器2025

2025怎么上pixiv  佛跳墙官网下载2025破解版  蓝灯vp官网npv,蓝灯vp官网2025,蓝灯vp官网vps,蓝灯vp官网vn  唐师傅加速器app,黑洞加速下载器下载,酷通加速器2025最新版,开挂专用加速器  哇哇加速器pc版下载,哇哇加速器vqn,哇哇加速器2025,哇哇加速器2025年  青蛙加速器官网,青蛙加速器破解版,青蛙加速器2025,青蛙加速器打不开了  啊哈加速器破解版,啊哈加速器npv,啊哈加速器vqn,啊哈加速器2025  茄子加速器破解版,茄子加速器npv,茄子加速器2025,茄子加速器不能用了